6.8 mW GES Power Plant Project

KOCADERE / DENIZLI – TURKEY (2018)

Power: 6.8 mW Location: Kocadere/Denizli Date: 2018

Project Details

The installation of the 6.8 mW land type solar power plant project, which we have undertaken in Kocadere, Denizli/Pamukkale district of Turkey, has been completed and made ready for electricity generation. The solar power plant with a power of 6.8 mW, the installation and design of which was completed successfully, was commissioned in 2018. 6 central inverters with 1 MW power were used, 1144 KW DC installation per mW and 3 km overhead power transmission line were built.